All service pipes shall be laid at least eighteen (18) inches under the ground and
provided with stop and waste inside the property line to properly drain all pipes
aboveground.
(Code 1966, § 24-22)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');